▽TOKYO ELECTRIC POWER COMPANY - Photos and Videos Library| TOP ●04/25 18:03 2025.4.25 Fukushima Daiichi Nuclear Power Station Second Fuel Debris Trial Retrieval from Unit 2 Completion of Transportation of the Sampled Fuel Debris to Off-site Analysis Facilities2025.4.24 Fukushima Daiichi Nuclear Power Station Measurement Results Taken in Preparation to Transport the Fuel Debris Sampled During the Second Fuel Debris Trial Retrieval from Unit 2 to Off-site Analysis Facility